Material: | PE |
---|---|
Customized: | Customized |
Condition: | New |
Still deciding? Get samples of US$ 1500/Piece
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Item No. | OC-004 |
Size(mm) | 1050*1050*1950MM |
Carton | 1pc/1ctn |
Material | PE Ratten, metal |
MOQ | 50pcs |
Feature | Modern |
Usage Scenarios | Home |
Delivery time | Trial order lead time:10-15days. |
Formal order lead time:15-25days. | |
Payment terms | T/T or L/C, 30% deposit before production, the balance should be paid before delivery |
Loading port | Tianjin,China |
1)Usual packed in 2pcs/1ctn; 4pcs/1ctns; 6pcs/2ctns
2)Frame Package: with styrofoam paper; Hardwares in poly bags;
3)Carton: 5-layer cardboard carton
Export standard packing for loading container, no any damage happened.
1) Glass Package: Styrofoam Paper&foam sheet.
2) Frame Package: Legs wrapped with styrofoam paper, Hardwares in poly bags.
3) Carton: 5-layer cardboard carton following Stacking Test and Master Carton Drop Test
1.How about your quality?
We have QC department, they control every process,
start from purchasing raw material to finish the goods and loading the container.
2. What is your MOQ?
Usually 200 pcs per model for chairs and 50 pcs per model for tables .
3. Will you pack the goods with assembly instruction?
Yes, we put the assembly instruction into the package.
If you still don't know how to assemble, you may consult us.
4. If we want a sample, how much do we need to pay?
We usually charge 2 times price, and the transport fee should be paid by buyer,
we will return the extra money when you place order.
5. What about the leading time for mass production?
It depends on the order quantity and the product.
Usually our leading time is 20-30 days after order confirmed.
If you have any interest, please feel free to contact us. Thank you.